Page Content Index

Glossary Notes
• We use US spelling - e.g. "program" = "programme"
• The list below shows the range of definitions on each page;
   select the range containing your definition!

a

b

c

d

e

f

g

h

i

j

k

l

m

n

o

p

q

r

s

t

u

v

w

x

y

z

Letter

From

To

   

A

ABC

Acquisition

 

Acquisition Control

Activity Duration

 

Activity Duration Estimating

Adjustment

 

ADM

Analysis

 

Analysis and Design

Architecture

 

Architecture, executable

Attribute

 

Attrition

Award Letter

   

B

BAC

Baseline Management

 

Baseline Plan

Beta Distribution

 

Beta Test

Brainstorming

 

Branching Logic

Build

 

Build, Own, Operate, Transfer

Bypassing

   

C

C/SCSC

CASE (2)

 

Cash

Change Log

 

Change Management

Closed Projects

 

Closeout

Communicating with Groups

 

Communicating with Individuals

Complex

 

Component

Concurrency

 

Concurrent

Conflict

 

Conflict Management

Contending, in negotiating

 

Content

Contract Change Order

 

Contract Closeout

Contractor Evaluation

 

Contractor Furnished Equipment

Corporate Constraints

 

Corporate Data Bank

Cost Check

 

Cost Classes

Cost Performance Index

 

Cost Performance Indicator

CPM

 

CPN

Critical Path Method

 

Critical Path Network

Cycle Time

   

D

Daily Log

Decomposition

 

Default

Demonstrated Past Experience

 

Demonstration

Design Management Plan

 

Design Model

Deviation

 

Deviation Permit

Document

 

Document Control

Dynamic Classification

   

E

EAC

Economic Value

 

Economic Value Added

End Event (of a project)

 

End Item

Error

 

Error Probability

Estimating Factor

 

Estimator's Allowance

Excusable Non-Compensable Delays

 

Executable Architecture

Extra Works

   

F

f

Feedback

 

Feeder Chains

Firm Fixed Price Contract

 

Firmware

Forecast Final Cost

 

Forecast Remaining Work

FTP

 

Full and Open Competition

Fuzzy Front End

   

G

G&A

Governance Council

 

Governance Model

Guideline

   

H

Hammock

Hypothesis

   

I

I/T

Incentive Schemes

 

Inception

Information Distribution

 

Information Flow

Inspection Requirements

 

Inspection System Requirement

Interest-During-Construction

 

Interested Party

Investment

 

Investment Cost

Iteration

   

J

JAD

Just In Time

   

K

Key

KSI

   

L

Labor

Lead

 

Lead Contractor

Level of Effort

 

Level Start Schedule

Liquidated Damages

 

Listening

Lump Sum

   

M

Macro Environment

Management Styles

 

Management System

Master Project Schedule

 

Master Schedule

Measuring and Test Equipment

 

Mechanics Lien

Military Time

 

MIME

Monte Carlo Method

 

Monte Carlo Simulation

Must Start

   

N

N/A

Node

 

Non-Conformance

NTE

   

O

O&M

Operations Acceptance Review

 

Operations and Maintenance

Organizational Style

 

Orientation

Ownership of Quality Responsibility

   

P

P3s

PDM

 

PDM Finish to Finish Relationship

Personnel

 

Personnel Development

Planned Value

 

Planned Value for Work Accomplished

Portfolio

 

Portfolio Management

Predecessor Activity

 

Predecessor Task

Pro forma

 

Proactive

Processor

 

Procurement

Product Description

 

Product Experts

Program

 

Program Analyst

Program Planning

 

Program Schedule

Project

 

Project Accountant

Project Charter

 

Project Closeout

Project Environment

 

Project Evaluation

Project Management

 

Project Management Body of Knowledge

Project Mission Statement

 

Project Monitoring

Project Pre-Selection Meetings

 

Project Priorities

Project Sponsor

 

Project Stage

Project-Based Management

 

Projectized

PVWS

   

Q

QA

Quality Criteria

 

Quality Evaluation Methods

Quotation

   

R

RAM

Refinement, Schedule Refinement

 

Regression Analysis

Request for Change

 

Request for Information

Resource Aggregation

 

Resource Allocation

Resource Set

 

Resource Smoothing

RF

 

RFA

Risk Identification

 

Risk Log

Risk Response System

 

Risk Review

Runaway Project

   

S

S Curve

Schedule Status

 

Schedule Template

Scope Criteria

 

Scope Definition

Selection

 

Self Directed Work Teams

Simultaneous Engineering/Design

 

Single Sourcing

Sole Sourcing

 

Solicitation

Sponsor

 

Sponsoring Group

Standard

 

Standard Construction Technologies

Statusing

 

Steering Committee

Subproject

 

Subproject Work Breakdown

Support

 

Support Services

Systems Scope Description

   

T

T&M

Team Decision Making

 

Team Development

Technique

 

Technological

Throughput

 

Tied Activities

Time-Scaled Logic Drawing

 

Time-Scaled Network Diagram

Trade-Off

 

Trades

Type

   

U

UB

Utilization

   

V

VAC

Variation Order

 

VE

Volume

   

W

Wage

Work Breakdown Structure

 

Work Breakdown Structure Component

WYSIWYG

   

Y

Yield

Yield

   

Z

Zero Based Budgeting

Zero Float